CariJob Logo
Kembali ke Cari Kerja
H

PROJECT MANAGER (DATA CENTRE CONSTRUCTION) - JB/KL [Job Code 2403108A]

SGD 3K - 3.8K

Paya Lebar, Wilayah Timur, Singapura

Ketentuan Pekerjaan

Diploma, Sarjana

Penuh Waktu

Deskripsi Pekerjaan

Due to expansion of our client’s business, we continue to look for suitable candidates to work at our client’s data centre site. Write to us if you are an individual who has experience in the activities listed below, and is keen to take up new challenges!

Responsibilities:

  • Manage project execution for green and/or brown field projects
  • Lead project team including engineers and contractors
  • Oversee day to day construction oversight to ensure the project is carried out per project specifications and EHS requirement, and is on schedule and cost efficient per approved budget.
  • Provide timely and accurate reporting of project progress and expenditure to management
  • Ensure Environment, Safety and Occupational Health implementation on site
  • Troubleshoot issues during design & construction phase
  • Ensure that content of all submission is aligned to Company & client’s requirement
  • Evaluate on-site installation quality & rectify problems
  • Participate in site testing and commissioning process
  • Serve as a lead to provide advice & guidance during handover
  • Maintain tracker sheet on defects & assign manpower for defect clearance

Requirements:

  • Degree/Diploma with at least 7 years’ experience in project / engineering / construction management. Experience in green and/or brown field data centre projects preferred.
  • Ability in reading design and construction drawings for all fields (Architectural, Structural, M&E, etc.)
  • Knowledgeable in various M&E critical systems (e.g. UPS, Generator, Chiller, Cooling Tower) requirement including testing and commissioning (i.e. FAT, SAT, IST)
  • Positive proactive attitude and ethical behaviour.
  • Experience in Microsoft Office i.e. Microsoft Word, Excel and PowerPoint.
  • Knowledge in project management tools, solutions, and techniques highly desirable.
  • Familiarity with Authority Requirement and Code of Practice preferred
  • Excellent interpersonal, communication and people management skills.
  • Good leadership and team player with ability to work independently and resolve challenges in a fast-paced environment.
  • Excellent interpersonal, communication and collaborative skills.

Please send your cv to

  • aw.hrexchange@gmail.com
  • in word document;
  • listing your personal particulars, education qualification and work experience;
  • listing your current and expected salary details;

As we are hiring this position urgently, we do look forward to hearing from you VERY SOON!

Only shortlisted candidates will be notified.

EA Licence No: 22C1055

EA Personnel Registration No: R2095104

Keterampilan

Project Management, Interpersonal skills, people management skills, leadership skills

H
HR Exchange Pte Ltd4 pekerjaan
-
0 - 50
Paya Lebar, Wilayah Timur, Singapura