CariJob Logo
Kembali ke Cari Kerja
H

BIM MANAGER (DATA CENTRE CONSTRUCTION) - JB/KL [Job Code 2505105A]

SGD 3K - 3.6K

Paya Lebar, Wilayah Timur, Singapura

Ketentuan Pekerjaan

Diploma, Sarjana

Penuh Waktu

Deskripsi Pekerjaan

Due to expansion of our client’s business, we continue to look for suitable candidates to work at our client’s office. Write to us if you are an individual who has experience in the activities listed below, and is keen to take up new challenges!

Responsibilities:

  • Manage and coordinate BIM implementation throughout the project design and final model preparation.
  • Act as the primary contact for all BIM-related matters for assigned projects.
  • Ensure accuracy and completeness of the BIM Execution Plan.
  • Oversee updates to models, specialized models, and related databases.
  • Prepare drawing submission lists based on contract requirements.
  • Lead and supervise BIM Engineers to meet project timelines and standards.
  • Monitor drawing submissions and regularly update their status.
  • Support the Project Team with design changes, updates, and related issues.
  • Maintain and update all models, drawings, and documentation.
  • Attend BIM coordination meetings.

Requirements:

  • Minimum Diploma in Engineering or equivalent.
  • Minimum 7 years of experience in BIM modelling and coordination.
  • Certified in BIM modelling and management.
  • Proficient in relevant BIM software.
  • Strong communication and leadership abilities.
  • In-depth M&E engineering knowledge and design experience.
  • Data centre project experience is an advantage.

Please send your cv to

  • aw.hrexchange@gmail.com
  • in word document;
  • listing your personal particulars, education qualification and work experience;
  • listing your current and expected salary details.

As we are hiring this position urgently, we do look forward to hearing from you VERY SOON!

Only shortlisted candidates will be notified.

EA Licence No: 22C1055

EA Personnel Registration No: R2095104

Keterampilan

BIM Modelling and co-ordination, BIM software, Communication and leadership skills, M&E Engineering

H
HR Exchange Pte Ltd4 pekerjaan
-
0 - 50
Paya Lebar, Wilayah Timur, Singapura